Name
Museum Tower Kyobashi
Location
1-7-2 Kyobashi Chuo-ku, Tokyo
Access

4 minutes on foot from the Yaesu Central Gate from Tokyo Station (JR lines/Tokyo Metro Marunouchi Line)

4 minutes on foot from Exit B1 from Nihombashi Station (Tokyo Metro Ginza Line/Tozai Line/Toei Asakusa Line)

4 minutes on foot from Exit 6 from Kyobashi Station (Tokyo Metro Ginza Line)

Proprietor
Nagasaka Corporation, Ishibashi Foundation (divided ownership by two legal entities)
Design and Construction Supervision
Nikken Sekkei Ltd.
Construction
Toda Corporation
Completion
July 1, 2019
Structure
Steel structure with partial RC structure, base isolation structure (seismic isolation layer between the second basement and first-floor level)
Floors
23 floors above ground, 2 floors underground, 2 floors penthouse
Building Height
149.56m
Zone/District
Commercial district (1300%/100%), fire prevention district, urban parking place development zone
City Planning
Special urban renaissance district, district plans, etc.
Property Use
Office, museum, motor garage
Site Area
2,813.74㎡
Building Area
2,212.83㎡
Floor Area
41,829.51㎡
Parking Lot

Mechanical parking: 91 spaces (regular vehicles: 67, high roof vehicles: 24 (of which 8 are with EV charging stations))

Flat parking: 4 spaces (backyard: 2, wheelchair only: 2)

Drop-off Area
Roundabout on the 1st basement floor
Bicycle Parking
15 (12 for public, 3 for museum)
Elevator

8 passenger elevators with a capacity of 17 persons (4 for high-rise floors from 16th to 22nd, 4 for mid-rise floors from 10th to 16th)

1 passenger and service elevator (also serving as an emergency elevator) with a capacity of 17 persons (for all floors from 2nd basement to 23rd floor)

Escalator
4 (2 for 1st to 2nd floors, 2 for 1st to 3rd floors)
Building Management
On-site management at the 2nd floor disaster prevention center and the 3rd floor administration office
Property Management Company
MITSUI FUDOSAN BUILDING MANAGEMENT CO., LTD.
Security and Disaster Prevention
24-hour manned monitoring on the 2nd floor disaster prevention center, CCTV camera
Power Supply
Extra high-voltage 22 kV, double-line access
Emergency Power Generator Equipment for Building
Number of gas turbine power generators (1,500kVA): 2, number of oil tanks (50,000L capacity): 2
The equipment above is installed on the 9th floor, 72-hour operation
Environmental Facilities
Renewable energy electricity: 100%, solar panels (10kW) on the rooftop
Rooftop and wall greening, wastewater and rainwater recycling systems with gray water treatment, natural ventilation systems
Accessible Facilities
Accessible parking lot, accessible elevator, multipurpose restroom
Building Amenities
Pantry on each floor; cafe, unmanned shop, large conference room on 16th floor; rental meeting rooms on 3rd floor
Rooftop garden with a refreshment lounge, exclusively for tenants, on the 23rd floor

Office Floor Overview

Standard Leased Floor Area
1,313.15㎡, *21st floor: 790.75㎡, 22nd floor: 1,120.85㎡
Standard Floor Ceiling Height
4,200 mm (top of the coved ceiling), 3,100 mm (north and south perimeters), 2,800 mm (partially 2,600 mm) (under the beams)
Ceiling Finishes
Top of the coved ceiling: exposed concrete with a painted finish, north and south perimeters: 640 square grid ceiling
21st and 22nd Floor Ceiling
Ceiling height: 3,300mm, 640 square grid ceiling
HVAC System
Water-source multi-split type packaged air-conditioning system (3 circuits per floor and 48 zones on each floor)
A/C Expansion
Available for the additional installation of split air conditioners (space for outdoor units on the balcony available)
Electric Capacity
Lighting: 15VA/㎡, power outlet: 50VA/㎡, electric power: non
Floor Load
General area: 500kg/㎡, heavy-duty zone: 800kg/㎡
Raised Access Flooring
Raised floor height: 350mm (partially 100mm at inverted beams)
Security
5 flap barrier gates on 1st and 3rd floors
Standard Floor Restrooms
Men's restroom: 3 stalls and 4 urinals, women's restroom: 3 stalls, multipurpose restroom: 1
Standard Floor Pantry
1 for each floor
Evacuation Safety Verification
Certified by the Minister through the building evacuation safety verification method (route C) and fire resistance verification (route C)